Under the Town of Jupiter Island's zoning formula, a two-acre lot in the A-80 district can carry about 10,563 square feet of total floor area. Town staff can sign off on only about 7,394 of those square feet on their own. Above that line, the project goes to the Development Review Board. The town code says plainly that the board can approve less than the full allowance. On Jupiter Island, a buyer purchasing land to rebuild gets a guaranteed share of the allowance plus a share that has to be won at a hearing. In 2026 the Town Commission changed the rules for that hearing.
The sections below explain how the formula works, who can send a project to review, and which 2026 changes are adopted, pending or still open going into the winter season.
The Formula Sets the Maximum Floor Area
Jupiter Island zones its residential land into districts such as A-80, B-40, C-35, D-25 and E-12. Each has its own minimum lot size: two acres in A-80, one acre in B-40, 35,000 square feet in C-35, 25,000 in D-25 and 12,500 in E-12. In the A-80 and B-40 districts, permitted floor area is calculated in tiers: 17.25 percent of the first acre, plus 7 percent of the land between one and four acres, plus 3.5 percent of anything beyond four acres. C-35 uses 20 percent of the first acre, then 10 percent, then 3.5 percent. D-25 and E-12 allow the greater of 3,750 square feet or 20 percent of the lot on smaller parcels, then step down in tiers.
The numbers below are our own calculations from those formulas for typical lot sizes.
| Lot | Maximum floor area | 70 percent line for staff approval |
|---|---|---|
| E-12 or D-25, 25,000 sq. ft. | about 5,000 sq. ft. | about 3,500 sq. ft. |
| C-35, 35,000 sq. ft. | about 7,000 sq. ft. | about 4,900 sq. ft. |
| B-40, one acre | about 7,514 sq. ft. | about 5,260 sq. ft. |
| A-80, two acres | about 10,563 sq. ft. | about 7,394 sq. ft. |
Two more limits apply on top of the formula. In every one of those districts, a principal dwelling is capped at 10,000 square feet, and any accessory building cannot exceed one-third of the principal dwelling's floor area. On a large ocean-to-Intracoastal parcel, the formula can produce far more than 10,000 square feet. The extra cannot go into the main house. It can only go into guest houses and other accessory buildings, each one no larger than a third of the main house.
The Town's development application also says that total floor area includes "living space and non-living space." Garages, cabanas and mechanical rooms all count against the total. That is often why the review line arrives sooner than a buyer expects.
Above 70 Percent, the Remaining Allowance Is Discretionary
The 70 percent line determines who decides. Under Article X of the town code, applications that stay below 70 percent of the lot's maximum floor area can be approved by two administrative officials. Applications above that line require impact review by the Development Review Board.
In impact review, the applicant has to show that the project is compatible with the neighborhood, keeps its visibility from the road, the beach, the ocean and the Intracoastal to a minimum, is screened from adjoining properties, and has street plantings comparable to the frontage within 1,000 feet in both directions. If a design cannot meet those standards, the code says the owner "may not be entitled to develop all of the floor area and/or building height" the district otherwise allows, and may need larger setbacks than the district minimums.
The code also used to offer ways to build more than the formula allowed. Ordinance No. 401, adopted December 6, 2024, repealed the divisions on "alternative development standards" and "increases in floor area." A rebuild on Jupiter Island today starts from the formula, with no published route above it.
From a builder's perspective, design starts with a target square footage, and setbacks, screening and landscape buffers are designed around it. On a two-acre lot, the second 3,000 square feet are approved through a review that turns largely on what neighbors can see.
Neighbors Can Request a Hearing
Projects below the 70 percent line can still end up at the board. Under Section 1.02, as amended by Ordinance No. 411 on September 16, 2025, a written request from any property owner within 1,000 feet, filed within 21 days of mailed notice, requires officials to send the application to the Development Review Board. Officials can also refer a project on their own if they see a reasonable likelihood of adverse impact.
In February 2026, the Commission adopted Ordinance No. 415 on a 5–0 vote. It lets a commissioner call up a Development Review Board order with a written request filed within 10 days. If three commissioners vote to take the case, the Commission hears it again from the beginning, and changing or denying the board's order takes a supermajority.
An appeal at the same February 25 meeting showed how far the process reaches after approval. A board decision for 7 South Beach Road was appealed. The appeal argued that the required landscape buffering had not been installed and that the driveway had been built differently from the approved plans: rectangular instead of round, expanded, with a smaller interior island and stone in place of the approved paving. The agreement called for ten six-foot Clusia trees planted five feet apart to create an opaque buffer, restoration of the driveway island to its 2022 size, and inspection by the Building Department, all within 90 days. The Commission voted 4–0 to hold the appeal in abeyance until the agreement was completed. The case shows that a landscape plan on Jupiter Island is a binding condition of approval. It is enforceable after construction, and a neighbor can raise it.
What 2026 Changed, and What Is Still Pending
The Commission spent much of 2026 revising these rules. Here is where each item stood in the meeting records as of early October:
| Item | What it does | Status |
|---|---|---|
| Ordinance No. 415 | Lets the Commission call up Development Review Board orders | Adopted 5–0, Feb. 25 |
| Ordinance No. 416 | Raises allowable fill without a variance from 3 to 4 feet | Adopted 3–2, Feb. 25 |
| Ordinance No. 417 | Ties height variances to the hardship standard | Adopted 5–0, Feb. 25 |
| Ordinance No. 418 | Rewrites the standards for granting variances | Adopted 4–0, Mar. 25 |
| Basement zoning in progress | Paused basement permits involving floor-area measurement | Lifted 5–0, Apr. 22; policy unresolved |
| Winter construction rules | Seasonal hours and limits on heavy equipment | Proposed; no adoption found |
| Ordinance No. 419 | Off-site contractor parking | Not brought back |
| Ordinance No. 420 | Rules for administrative approvals and changes to approved plans | Still being redrafted |
Fill. Ordinance No. 416 matters most for new design because building height on the island is measured from average finished grade, and fill changes that grade. The Town's application PDF still shows a 3-foot maximum. The ordinance raised the amount allowed without a variance to 4 feet. To go higher, an applicant must meet the hardship standard and address adjacent building heights, runoff, visibility and the need to reach a 6.5 NAVD finished-floor elevation.
Basements. On March 25, the Commission voted 3–1 to start a zoning in progress on basements. On April 22, staff recommended pulling the written resolution, citing "potential implications associated with Senate Bill 180," and the Commission later voted 5–0 to lift the pause. In the discussion, several commissioners favored allowing basement space only for storage, mechanical rooms and garages, with no living space. Whether basement area should count toward maximum floor area was left open. Basement policy was on the agenda again on July 22. A buyer who plans to put a garage or mechanical space below grade is planning around a policy the Commission has not settled.
Winter work. An April 15 draft defined winter as November 1 through April 30. It would bar heavy equipment such as cranes, pile drivers and jackhammers during that period and limit winter construction hours to 8:30 a.m. to 5:30 p.m. on weekdays and 8:30 a.m. to 1 p.m. on Saturdays. Commissioners said they wanted rules in place before the next winter season. As of the September 14 agenda, the records reviewed showed no adopted winter construction ordinance. One seasonal rule is already in the code: demolition approvals prohibit stopping traffic between November 1 and April 15.
Oceanfront Lots Need a State Permit First
Oceanfront parcels have one more step, and it determines the order of the work. Where a Florida Department of Environmental Protection Coastal Construction Control Line permit is required, the applicant must obtain it and give it to the Town before the Town will issue a building permit. The state describes CCCL siting and design criteria as potentially stricter than ordinary coastal building rules. The Town's checklist for the state submittal covers the frontal dune, the 30-year erosion projection line, dune crossovers, native dune planting and sea turtle lighting. These items affect where a house can sit on the lot, so they shape the design from the start.
Before Writing an Offer
The Town's process suggests a sequence for buyers to work through during due diligence:
- Confirm the zoning district and lot area on a current survey, then calculate the maximum floor area and the 70 percent line.
- Add up every enclosed space you intend to build, garages included, and compare the total with both numbers.
- List the properties within 1,000 feet, since those owners receive notice and can request a hearing.
- Check whether the parcel falls under the CCCL program.
- Treat basement plans and winter construction schedules as open questions until the Commission acts.
The Town's pre-application step is a review by the building official, estimated at five business days. It determines whether a project goes to administrative approval, the Development Review Board or the Town Commission. Agendas and minutes are posted on the Town's CivicClerk portal. The full district standards can be read in a transcription of the zoning code. Confirm the official text with the Town before relying on it.
FAQ
Does a garage count toward floor area? Yes. The Town's development application counts living and non-living space in total floor area.
Can a neighbor stop a project that is under the 70 percent line? A neighbor cannot stop it alone. An owner within 1,000 feet who files a written request within 21 days of notice can send the project to a Development Review Board hearing, and the board then decides.
Is the 10,000-square-foot cap changing? The meeting records reviewed through September 2026 show no ordinance changing it. The question of whether basements count toward floor area was still open.
Ryan Watley has held a Florida Certified Building Contractor license since 2004, and floor-area math is where we start with clients considering a Jupiter Island rebuild. If you are evaluating a lot or an older house on the island, Watley Coastal & Club Group can work through the formula, the review path and the pending ordinances with you before you write an offer. Contact Us.
This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.